GKB installs wave attenuation barriers with the Limach E88.1
The Limach E88.1 plays a key role in the installation of wave attenuation barriers in 's-Gravenzande. Working from a pontoon without access to a fixed power supply, GKB carries out the entire project emission-free. Thanks to smart charging solutions developed by our engineering team and the E88.1's Battery Swap System, the team can work efficiently throughout the day. Curious to see how GKB makes it work?